63)        Which task has the greatest schedule variance?
A. Task 1
B. Task 2
C. Task 3
D. Task 4
E. Task 5

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
72#
发表于 2012-10-11 08:16 | 只看该作者
64)        The process of evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards is called:
A. Quality Assurance
B. Quality Control
C. Quality Planning
D. Quality Review

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
73#
发表于 2012-10-11 08:16 | 只看该作者
65)        The process of monitoring specific project results to determine if they comply with relevant quality standards is called:
A. Quality Assurance
B. Quality Control
C. Quality Planning
D. Quality Review

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
74#
发表于 2012-10-11 08:17 | 只看该作者
66)        A histogram ordered by frequency of occurrence that shows how many results were generated by each identified cause is:
A. Statistical Histogram
B. Juran Histogram
C. Fishbone Diagram
D. Pareto Diagram

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
75#
发表于 2012-10-11 08:17 | 只看该作者

67)        Tools and techniques used during the Quality Planning process include:
A. Benefit/cost analysis
B. Benchmarking
C. Quality audits
D. a and b
E. all of the above

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
76#
发表于 2012-10-11 08:17 | 只看该作者
68)        The overall intentions and direction of an organization with regard to quality as formally expressed by top management is a:
A. Quality Plan
B. Quality Statement
C. Quality Policy
D. TQM

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
77#
发表于 2012-10-11 08:17 | 只看该作者

69)        CIP is:
A. Continuous improvement process
B. A sustained, gradual change
C. Includes constancy of purpose and commitment to quality as part of its focus
D. a and b
E. all of the above

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
78#
发表于 2012-10-11 08:17 | 只看该作者
70)        The practice of ceasing mass inspections and ending awards based on price is credited to:
A. Edward Deming
B. Philip Crosby
C. Juran
D. Pareto

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
79#
发表于 2012-10-11 08:17 | 只看该作者
71)        Quality is:
A. Zero defects found
B. Conformance to requirements
C. The totality of features and characteristics of a product or service that bear on its ability to satisfy stated or implied needs
D. b and c
E. all the above

使用道具 举报

回复
论坛徽章:
1
ITPUB新首页上线纪念徽章
日期:2007-10-20 08:38:44
80#
发表于 2012-10-11 08:18 | 只看该作者

72)        The concept of making a giant leap forward followed by a period of maturity is:
A. Innovation
B. Continuous improvement
C. Just in time
D. Paradigm


使用道具 举报

回复

您需要登录后才可以回帖 登录 | 注册

本版积分规则 发表回复

TOP技术积分榜 社区积分榜 徽章 团队 统计 知识索引树 积分竞拍 文本模式 帮助
  ITPUB首页 | ITPUB论坛 | 数据库技术 | 企业信息化 | 开发技术 | 微软技术 | 软件工程与项目管理 | IBM技术园地 | 行业纵向讨论 | IT招聘 | IT文档
  ChinaUnix | ChinaUnix博客 | ChinaUnix论坛
CopyRight 1999-2011 itpub.net All Right Reserved. 北京盛拓优讯信息技术有限公司版权所有 联系我们 未成年人举报专区 
京ICP备16024965号-8  北京市公安局海淀分局网监中心备案编号:11010802021510 广播电视节目制作经营许可证:编号(京)字第1149号
  
快速回复 返回顶部 返回列表