原帖由 samda 于 2008-7-21 11:24 发表 ![]()
zelef:你好
有几个问题不明白
(1) 你提到Required Ship Schedule 可用来做MRP,企业中应该什么角色,来负责做这个发运日程?
(2)下段中说,按客户下达发运日程替换计划日程开始部分,剩余的计划日程数量,按上次累计数量调整是什么意思?
不太容易明白
If the order is using netting logic 3, the value of Use Ship/Plan PCR in Customer Schedules Control affects the schedule calculation.
• If No, the beginning of the planning schedule is replaced by the shipping schedule and no prior cumulative quantities are considered.
• If Yes, the beginning of the planning schedule is replaced by the shipping schedule and remaining planning schedule quantities are adjusted by prior cumulative quantities.
谢谢zelef!!!!
不用客气。
(1)做MRP的,在企业内部一般都是由Master scheduler来做,做发运日程的也专门有负责出货的人民具体角色每个公司可能职位称呼不同而已,比如客户排程专员...
(2)
• If No, the beginning of the planning schedule is replaced by the shipping schedule and no prior cumulative quantities are considered.
如果不是logic 3,计划排程的初期 是被shipping schedule取代,而且之前累计数量不进行考虑
• If Yes, the beginning of the planning schedule is replaced by the shipping schedule and remaining planning schedule quantities are adjusted by prior cumulative quantities.
如果是的话,剩余计划schedule数量,由上次累计数量调整
就是剩余schedule数量会按照上次累计数量来算,比如说总有schedule有1000个,上次累计已发800,剩余数量就更新为200
[ 本帖最后由 zelef 于 2008-7-25 10:40 编辑 ] |
|