|
原帖由 jcg1984 于 2008-4-8 16:00 发表 ![]()
這個問題找到的解決方法
SolutionTo implement the solution, please execute the following steps:
1. Go into the responsibility: Oracle Order Management
2. Navigate to Shipping >
3. Query the delivery/order in the Shipping transactions form.
4. Tab to the delivery tab and in the actions button, choose the Reopen option.
Hit GO. (Status should change to Open.)
5. Then choose the Unassign From Trip option in the same tab. Hit GO.
6. Confirm the delivery now has a status of Open and the trip field (Path by
7. Trip tab) is blank – with the exception of the Status field, which will say
“Open”.
8. After confirming this, then in the actions button choose the ship confirm.
Confirm order as normal. (Make sure that the ship date is in the current
open period - don’t go back to when it actually did ship, if that was in a
different month.) You should get the message: Delivery was successfully
confirmed. The status of the delivery will become closed, and the Interface
Trip Stop should run. (Be sure the Interface Trip Stop completes successfully.)
学习。 |
|