|
ASCP的新功能的问题: 在workbench做Reschedule In, Reschedule Out, Cancel
在工作台, 选中Action = Reschedule In或Reschedule Out或Cancel的PO或 PR, 按plan菜单下的release.
这个功能我还没有成功过, 到metalink下了个TAR, metalink说只要满足三个条件:
1. 运行ASCP后, 没有改过PO或PR的need by date.
2. assigned the organisation to the responsibility in advanced planning administrator > Admin>ora
ganization security
3. Encumbered is not being used for this PO
第一个条件总是满足不了, 运行ASCP后, need by 就自动改了. 我们已经对PO和ASCP做了定制, 所以测试不下去了, PM有更多的麻烦, 也暂不关心这个问题. |
|