|
wenglian 发表于 2012-2-27 08:26 ![]()
CO01进去如果不设定计划日期,表头——日期变更设定不了。如图一
设定计划日期后,才可以点击日期变更设 ...
LZ,不知道你解决了没有,如果没有的话,看下面的:
IMG Shop floor control->Operation->Scheduling->Define scheduling parameters for WO
找到工厂+订单类型+生产调度员的组合,在Scheduling control for detailed scheduling的页签中,去掉From production dates的勾
这个选项的意义:
Indicator with which you specify which dates have to be entered when you create or change an order:
If the indicator is set, you must enter one or more production dates (scheduled dates).
If the indicator is not set, you must enter one or more basic dates.
|
|